Movie rating
0 votes

S36E15 Lexington Project 2015: Part 7: Inspections Episode

Lexington Project 2015: Part 7: Inspections

Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.

  • Posters

  • Backdrops

  • Interesting links

  • Trailers

Release name