S36E15 Lexington Project 2015: Part 7: Inspections Episode
Lexington Project 2015: Part 7: Inspections
Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.
-
Posters
-
Backdrops
-
Interesting links
-
subtitles
-
Trailers