ការដាក់ពិន្ទុក្រិតខ្សែភាពយន្ត
0 សំលេងឆ្នោត

S13E08 The Wayland House - 8 Episode

The Wayland House - 8

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

  • ក្រដាសផ្សព្វផ្សាយ

  • Backdrops

  • តំណដែលគួរឲ្យចាប់អារម្មណ៍

  • ថ្រេល័រ

ឈ្មោះចេញផ្សាយ