ការដាក់ពិន្ទុក្រិតខ្សែភាពយន្ត
0 សំលេងឆ្នោត

S34E23 Essex 2012/13 Part 8: Shiplap Walls, Finished Yard Episode

Essex 2012/13 Part 8: Shiplap Walls, Finished Yard

Norm visits the last shipyard still located in Essex, Mass. A home that was restored with accessible retrofits is toured. At the cottage shiplap barn-board walls are installed; the mantel is built; Roger finishes the yard; and Kevin checks on the reclaimed tile hearth.

  • ក្រដាសផ្សព្វផ្សាយ

  • Backdrops

  • តំណដែលគួរឲ្យចាប់អារម្មណ៍

  • ថ្រេល័រ

ឈ្មោះចេញផ្សាយ