S35E14 Arlington 2014: Part 6: Additional Details Episode
Arlington 2014: Part 6: Additional Details
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.
-
Plakater
-
Backdrops
-
Interessante links
-
undertekster
-
Trailere