Film Puanı
0 Oylar

S44E19 Ipswich: Below Grade Plumbing Episode

Ipswich: Below Grade Plumbing

The old fireplace firebox is demolished leaving the chimney for the new fireplace. The dismantled timber frame pieces are restored offsite. Plumbing is run for a below grade bathroom. A steel beam is prepared for installation. Kevin goes clamming.

  • Posterler

  • Backdrops

  • İlginç Linkler

  • Fragmanlar

Film Adı