Рейтинг на филм
0 гласовеs

S44E24 Ipswich: New Life Episode

Ipswich: New Life

A granite veneer water table is installed. The old roof boards are installed on the ceiling of the new ell. A dry laid stone wall is built. The plumbing manifold is discussed. A carpenter talks about leaving corporate and returning to the trades.

  • Плакати

  • Backdrops

  • Интересни връзки

  • Трейлъри

Име на релийз