Reputazione film
0 voti

S44E24 Ipswich: New Life Episode

Ipswich: New Life

A granite veneer water table is installed. The old roof boards are installed on the ceiling of the new ell. A dry laid stone wall is built. The plumbing manifold is discussed. A carpenter talks about leaving corporate and returning to the trades.

  • Collegamenti per inviare commenti

  • Backdrops

  • Collegamenti Interessati

  • Trailers

Nome pubblicato