Рейтинг стрічки
0 голосів

S44E24 Ipswich: New Life Episode

Ipswich: New Life

A granite veneer water table is installed. The old roof boards are installed on the ceiling of the new ell. A dry laid stone wall is built. The plumbing manifold is discussed. A carpenter talks about leaving corporate and returning to the trades.

  • Постери

  • Backdrops

  • Ціківі посилання

  • Трейлери

Назва при релізі